Company of Si Kening of American Europe article was released on May 23, 2023 can develop a report continuously 2022, summarized a company to be able to develop the progress of target respect continuously 2030 in implementation.
The 17th this report is Ouwensikening can develop a report continuously, this company issued the first report 2006. The point that reported 2022 is as follows:
In the Wu of 3 great undertaking of the company, ouwensikening offerred the product with wide range, managing the sources of energy mixes help client reduce discharge. 2022, the income of 63% comes from this company this kind of product, cover roofing material, heat insulating materials and composite material.
Can last of the company development directs is:
• adds the positive effect of its product;
• manages his the negative effect halve of business;
• eliminates harm, improve the life quality of employee and its family;
• is promoted include gender and diversity, produce positive effect to its community.
The remarkable success that in reporting 2022, summarizes includes:
Reduce greenhouse gas to discharge: 2022, limits 1 with limits the discharge capacity of 2 is compared the bottom line decreased 2018 22% . These results make the company nears its end more, arrive namely 2030 limits 1 with limits of 2 greenhouse gas discharge capacity (it is a foundation with the market) decrease 50% .
Convert but second birth electric power: 2022, inside global limits, ou Wensi division makes an appointment with the place of 56% to come from with electric power rather but second birth the sources of energy, include wind energy, water can, solar energy and ground heat energy. The definition of this index is: Come from electrified wire netting but the agreement buying electricity of second birth the sources of energy and company (PPA) with the fictitious agreement that buy electricity (include the spot to generate electricity) offerred the sources of energy. 2022, the company signed VPPA in Spain, predict to was mixed 2023 2024 the line on grading. Contract size is 81.9 million tile, predict to be able to produce electric power of 223 auspicious watt-hour every year.
Circular economy: Ouwensikening is European ZEBRA (ZerowastE Blade ReseArch) the partner of the project, this project is combine of a door that cross a ministry, devote oneself to to develop lamina of the first 100% wind- driven turbine that can reclaim. 2022, this project obtained a milepost, produced the first archetypal blade, research and development of group of wind energy science and technology the new-style high-powered glass that holds with colophony photograph. Regard material project as the partner, the company still offerred an experiment matrix, in order to back blade design and 25 tons of production of fabric and pay.
Hold the termless attention to safe production: 2022, can record an accident to lead for 0.65. According to bureau of American labor statistic the report 2021, this one performance is more average than manufacturing industry the level is advantageous 81% (newest data) .
Service community: Peaceful company of Ou Wensi family and Ouwensikeningjijinhui offerred the cash of 7.6 million dollar and objective to donate, seek profits with supportive blame organization, the housing with key safe and efficient attention, basic health and health care and educational opportunity.
Search
Duplicate