New Year beginning, production project of research and development of Gaoke aerospace composite material is advancing the De Yi that plans to always invest 2.13 billion yuan in order. Heart ala tall division is scientific research of a market, production, sale the advanced carbon at an organic whole base complex new material is new and high technical company, in October 2019 settle establishs heart aviation small town, go into operation of industrial garden district was built in May 2020. At present this company has mastered 50 multinomial inventions, the product applies extensively at the domain such as traffic of aerospace, orbit, car, Guang Fufa report, market prospect is capacious. Kong Linghua of president of heart ala tall division introduces, project first phase invests 500 million yuan, with the ground 50 mus, plan to build to produce per year 20000 planes carbon / carbon and carbon / product line of undercarriage of contented Buddhist templeput on the brakes, synchronous make new material test and center of research and development. The carbon with country will be become important after project building base base of the research and development of complex new material, production. “ with compound attrition material gives priority to carbolic radical body, hot field material and ablation material are both wings, it is the core that we develop a program. ” Kong Linghua expresses, “ we are Zhejiang provinces in carbon / carbon of composite material domain exclusive an enterprise, also be the company that this domain has batch equipment capacity the 4th times. ”According to De Yi Gao Ke's staff member introduces, production project of research and development of composite material of aerospace of heart ala Gaoke is key of Zhejiang province “152” project of project of advanced manufacturing industry, also be Hangzhou city “ at the same time project of auspicious tall ” . Project since start working will be built May last year, the project goes well. Current, multi-purpose building of a two workshop, research and development and worker dormitory complete construction basically already, approve main body equipment to enter the arena formally already, plan in June 2021 the portion is formal put into production, predict full load produces annual produce to be able to amount to 500 million yuan.

2024
Newsolar Conference
15-18 December

New York City