This second exhibit can be versed in by the country the dominant that believe a ministry, association of Chinese synthetic resin is specific sponsor, it is the grand meeting of industry of raw material of fat of a dedicated Yu Shu. The theme of the exhibition is new material and new equipment, its professional exhibit than Shenzhen refined scholar stronger. This exposition still set meeting of 11 special subject, every conference attracted colophony industry to swim up and down of the enterprise participate in. These enterprises will extend business communication, collaboration to the spot and ginseng, purchase and information is shared. Dimensions of itself of association of Chinese synthetic resin strength of giant, appeal is very, set 15 branch, covered whole colophony industry, this exhibited the discovery of the contact of enterprise and more cause client and business chance to provide safeguard to join. In exhibit meeting early days, branch and TV station undertook special subject is publicized related the city that do not have stannum, held a press conference, enlarged propagandist strength, to join the brand that postpones a business conduct propaganda provided strong support. On May 15, zhejiang province develops innovation appoint announce the province was built mainly 2023 and arrange project plan beforehand. Project name: Project of new material of high end of petrifaction of short for Zhejiang Province plans to construct content and scale: Build 6 million tons / year catalytic splitting decomposition, 240 thousand tons / year the 32 production unit such as double phenolic A. Before this, flourish filled petrifaction to issue the announcement about project of new material of investment high end, by construction of petrifaction of short for Zhejiang Province, predict to invest 64.1 billion yuan, be opposite 40 million tons / year the relevant plant that refine converts unifinication project undertakes digging going synergism, draft 4 million tons to build / year device of catalytic splitting decomposition, 350 thousand tons / year α- olefin device, 2×20 10 thousand tons / year device of POE polyolefin elastomer, 80 thousand tons / year polybutene - 1 device, 1 million tons / year acetic acid device, 2×30 10 thousand tons / year plant of acetic acid ethylene, , 4- Ding Erchun device, 200 thousand tons / year PBS device, 120 thousand tons / year get together device of 4 hydrogen furan, 30 thousand tons / year NMP device, 270 thousand tons / year nitric acid device, 660 thousand tons / year propylene nitrile device, 200 thousand tons / year SAR device, 300 thousand. Always invest: 64.1 billion yuan of planned project duration: 2022-2024 completes investment to 22 years of accumulative total: Investment of 1 billion yuan of 23 years of plans: Plans of 7 billion yuan of 23 years of plan: First device begins picket radical construction.
Origin: Downstream, Zhejiang province develops alkene and high end and reform committee