On Feburary 15, sataikesi announces preceded textile manufacturer, in Mexican north urban Ciudad Juárez establishs his factory of the 17th place. Current, workshop construction ends, equipment reachs the designated position entirely, manufacturing be all set, client attestation job is spreading out in order. As we have learned, initial phase, new plant produces concentration light quantify a building not to have fabric of curly Bo fine with much axial; Later period, will replace American factory to offer money for client of lamina of report of the wind inside area, make former and dedicated at developing market of rising general industry domain. In addition, sataikesi already planned choose period to will add newly inside plant area to produce a line, the raw material that ensures wind report client adequately is supplied.

2024
Newsolar Conference
15-18 December

New York City