On May 15, ministry of colophony of Ba Ling petrifaction organic chloric device jockeys the overhaul. Since after will be being overhauled on December 8 last year, driving, this device moves 158 days continuously, achieve long cycle ran best record since put into production 2002. Before this year 4 months, plant output grows 10% compared to the same period.
This organic chloric device by produce per year 28 thousand tons of chloric propylene unit and produce per year unit of 32 thousand tons of chloric propane to comprise. All the time since, because reaction line is clear carbolic cycle is short, cold evaporate tower is unusual the case such as frequency hair, efficient stability runs this unit be controlled about. To this, colophony ministry adds take by storm to close, wait for measure through optimizing craft, newer facility, essence to be operated definitely, in lengthen device cycle of run effectively while, reduced use up, promoted a product quality.
Optimize craft to control, solve manufacturing bottleneck. Backbone of technology of organic chloric plant insists 24 hours to take a class, dog production is dynamic; Hold regularly optimize meeting, the analysis produces a situation, discuss the plan that move actor. They do valve of temperature of good response system, pressure to accuse continuously, fulfil reaction water be assigned personal responsibility for to accuse measure, raise device to run stability, stable thick chloric propylene closes rate; Essence of life controls annulus of chloric propane unit to change the tower boiler temperature of the tower definitely, enact new control law, optimize fine tuning vacuum to spend, clean annulus to change a tower regularly, raise annulus to change efficiency, lengthen again boil implement the knot is anxious cycle of run.
Aggrandizement equipment manages, provide manufacturing safeguard. This are a target with hoist dependability, begin spot big punish, corrode material of serious conduit, equipment to undertake upgrading character to the spot, eliminate safe hidden danger, hoist intrinsic safety. Major to device unit and key equipment check equipment major everyday, “ charter flight is executed to make ” in team and group of a gleam of, undertake care and maintenance to the machine pump that contract everyday when class employee; Member of team and group presses check of requirement make one's rounds strictly, to discovery unusual reach hidden trouble to deal with in time; Begin foresight overhaul regularly, ensure equipment runs normally.
Fumble optimal flow, executive essence allows to operate. This organization key member combs influence device to move, quality of specific power consumption of content bad news, product and have the crucial index that optimizes a space, control circumstance and maneuverability according to index, fumble best craft operates circuit, work out " colophony ministry essence optimizes manual definitely " . Training Within Industry of post of each device aggrandizement, the requirement operates personnel to carry out technological process strictly according to manual, the monitor is supervised adjust, ensure essence of life allows to control; Technical personnel examines executive case everyday, every undertake comment and appraise, seasonable correct an error, avoid to be operated by accident.
Search
Duplicate