On March 29, nuclear iron gate closes city Milan to press down generation set of wind-force of project of 200MW wind cable to reach its in accessory equipment wins the bid candidate is fair show, this second in all 11 overall business was participated in bid. The ground is common show, continent place is car individual plant in win the bid candidate name, bid quote 465.8 million yuan, amount to is monovalent 2329 yuan / KW. Bid type is WT5000D195H107, 5MW fan, 195m of wind rotor diameter, tower height of cylindrical section spends 107m. Sea outfit is win the bid candidate the 2nd, bid quote 436 million yuan, amount to is monovalent 2180 yuan / KW; Golden wind science and technology is win the bid candidate the 3rd, bid quote 422.1 million yuan, amount to is monovalent 2110.5 yuan / KW. Announcement of invite public bidding shows, nuclear iron gate closes city Milan to press down project of 200MW wind cable to be located in a The Xinjiang Uygur Autonomous Region in cling to the city is like town of Milan of Qiang county churchyard, this project purchases wind- driven generation set to reach its accessory equipment (the canister that contain a tower) . 200MW of capacity of aircraft of project general assembly, stand-alone capacity is 4.0MW and above wind-force generation set, predicting date of delivery is in May 2022 ~ in July 2022.

China unsaturated polyester resin (UPR)
2024
Newsolar Conference
15-18 December

New York City