Site icon Newsolar Technology Group

Hong Kong builds chairman of bureau of flood group director to inspect Hui Zhouzhong to believe project of double phenolic A

On January 15, hong Kong builds Zhang Guorong of chairman of bureau of flood group director to lead group high level to course of study of company Hui Zhouzhong trustworthy project of double phenolic A makes an on-the-spot investigation. In make an on-the-spot investigation, zhang Guorong examined substance of project of double phenolic A, listen to owner project controller the report of circumstance of safe to the project, quality, plan, the positive result that to the project construction obtains gives sufficient affirmation, and to project ministry the arduous effort of faculty thankses. Hui Zhouzhong believes chemical limited company is Hong Kong establishs subsidiary of subordinate of group of flood chemical industry, held water 2004, be located in area of garden of petrifaction of development of technology of economy of Daya Bay of benefit state city, cover an area of 200 thousand square metre, use the advanced manufacturing technology on current world of the United States and Japan, build phenol acetone device and plant of double phenolic A. This company is current Hua Na area is only acetone of a phenol produces a business. Faithful letter chemical industry 450 thousand tons / year phenol acetone project, this project always invests 1.6 billion yuan, build 280 thousand tons / year phenol device and 170 thousand tons / year acetone device; Basically build build content to include intermediate tin area, acetone canister area, assemble and unassemble station, (vapour) reduce lukewarm reduce pressure room of station, control, become station of water of incinerator of electric place, liquid, loop, empty suppress nitrogen is refrigerant library of spare parts of station, machine parts or tools kept in reserve, danger abandons a library. Project of double phenolic ACover an area of an area to make an appointment with 77 thousand square metre, floor area is 24 thousand square metre about. Include 240 thousand tons to build scale of production / year device of double phenolic A reachs support features of form a complete set one set, deserve to establish central control room, change water of electric place, loop, add drug, the annex such as storehouse of station of water of pneumatics station, multi-purpose building, desalination, bubble station, sewage disposal station, double phenolic A.

Exit mobile version