Recently, you Huadong company bear the Dalian Heng Lishi that build turns limited company of new material science and technology 1.6 million tons / year high-powered colophony and 1#24 of new material project 10 thousand tons / year device of double phenolic A finishs crystallizer hoisting smoothly, the mark is worn project construction enters installation to work energetically level.
To ensure hoisting of the safe, high grade, efficient crystallizer that finish works, project ministry overcomes harsh environment effect, science manages as a whole, make special plan, reconnaissance construction site, prepare meticulously through early days, successful crystallizer hoisting perch, laid solid foundation for later period construction.
Heng Lishi is changed (Dalian) limited company of new material science and technology 1.6 million tons / year high-powered colophony and new material project
The project always invests 20 billion yuan, add 450 thousand tons newly / year device of annulus oxygen ethane, 200 thousand tons / year alcohol amine device, 30 thousand tons / year second maintains amine device, 42/26 10 thousand tons / year phenol acetone device, 2*24 10 thousand tons / year device of double phenol A (use ion exchange method) , 200 thousand.
According to Hengli petrochemical plans, the yield of 480 thousand tons of double phenolic A can, will ambitious be opposite at device of 260 thousand tons of PC of raw material use up, a of double phenol of constant force petrifaction will have many export volume to put in enter the market. The project amounts to postpartum annual produce twenty-five billion three hundred and seventy-five million yuan, construction cycle is came 2022 2024. Raw material basically is solution of ethane of oxygen of propylene, annulus, liquefied ammonia, methanol, benzene, styrene, glycol to wait, basically come from Heng Lilian turns unifinication project or outside buy. The product basically has get together amine of carbonic acid fat, double phenolic A, ABS, PS, alcohol add up to product of more than kinds of 30 chemical industry (raw material) .
2022, the company raises investment construction to include to produce per year high-powered colophony and 1.6 million tons of new material projects once more (contain 42/26 10 thousand tons / year phenol acetone device, 2*24 10 thousand tons / year device of double phenolic A) with 2.6 million tons 100 thousand tons of project of 600 thousand tons of high-powered polyester project, BDO, Ding Er are acerbity.