Recently, limited company of science and technology of new energy resources of Shandong Ming Houde produces per year composite material of high polymer of 80 thousand tons of high-powered environmental protection to set an example change project annulus to judge a file to accept open.
Project setting
Limited company of data of Shandong Ming Houde high polymer held water 2021. The company plans to rent bank unused workshop mixes city Ming Houde to plant area of limited company of the data that pack clearing, original plan plans to invest “ of two hundred and forty-two million five hundred and eighty-four thousand eight hundred yuan of construction to produce per year composite material of high polymer of 80 thousand tons of high-powered environmental protection to set an example change project ” , this project already undertook putting on record. Put on record content produces warehouse of machine parts or tools kept in reserve of the workshop, workshop that pack, public project workshop, spare parts to build each 1, build warehouse 5, build division of 1 place canister, construction of form a complete set is common at the same time reach support features, purchase installation to produce equipment and equipment of form a complete set in all 288 / set, with epoxy resin matrix, active thinner, flexibilizer is basically former complementary material, produce per year epoxy resin of modified of 35 thousand tons of liquid state through mixing agitate to be able to come true; Wait with agent of epoxy resin matrix, filler, drawing of patterns, solidify agent, double phenolic A for basically formerly complementary material, through answer deserve to mix, crowded piece, cut bead, dry, pack wait for working procedure, can come true produce per year epoxy resin of 45 thousand tons of solid. As a result of market prospect reason, the company plans to plan to invest 97 million yuan of construction to produce per year composite material of high polymer of 80 thousand tons of high-powered environmental protection to set an example only at present the first phase project that turns a project, workshop of main construction production mixes first phase project 1 times coal tub area 1, purchase installation solid annulus oxygen answer matchs the manufacturing facilities such as storage tank of boiler, colophony, solvent storage tank in all 116 / set, the matrix of raw material epoxy resin that first phase project buys external only and double phenolic A undertake answer match or cent outfit, after project building, produce per year solid epoxy resin 45 thousand tons, install epoxy resin matrix year minutes 35 thousand tons.
Project name: Produce per year composite material of high polymer of 80 thousand tons of high-powered environmental protection to set an example turn a project (first phase)
Project property: Build
Build a place: Shandong is saved bank to the south of Gao Sanlu of state city new and high district, new with Na Bin city Ming Houde packs plant area of data limited company 8 inside
Build an unit: Limited company of science and technology of new energy resources of Shandong Ming Houde
Construct content and scale: Workshop of main construction production mixes first phase project 1 times coal tub area 1, purchase installation solid annulus oxygen answer matchs the manufacturing facilities such as storage tank of boiler, colophony, solvent storage tank in all 116 / set, the matrix of raw material epoxy resin that first phase project buys external only and double phenolic A undertake answer match or cent outfit, after project building, produce per year solid epoxy resin 45 thousand tons, install epoxy resin matrix year minutes 35 thousand tons.
The project invests: 97 million yuan
Product program
Former complementary makings is used upProject former complementary makings basically uses up 70000 T/a of epoxy resin matrix, double phenolic A 10000t/a.