Use 3D prints a technology, can in the spot direct “ prints ” fan component, avoided large part to carry segment, make the lamina of superhigh tower canister and train in excess specified length becomes a possibility. Last year in June, the ” of “ of success of the technology of GE use 3D that print that print gave 10 meters tall canister of model fan tower. This second research costs 6.7 million dollar, by a definite date 25 months, the target of GE is the Xie Jian part that use 3D prints a technology to make a blade of a fan, long make an appointment with 10~15m. GE and lab of its partner Oakridge, United States but lab of second birth the sources of energy will have a test to the product, prepare to install 3 products fan to go up. Come for years, GE is seeking blade to produce innovation method of the technology all the time, try to print 3D technology and heat to shape, thermoplastic the advanced technology such as material is united in wedlock. Use light-duty thermoplastic composite material, through 3D the technology that print makes the lamina that go out can bring — of a lot of advantage—The load light-duty lamina that light-duty lamina can raise the light-duty lamina of electricenergy production of fan to be able to reduce tower canister can reduce system of gear case, transmission, bearing and base wear away is thermoplastic after material disassembles but on the spot is fused, of facilitating fan demolish and reclaim GE believes, if apex part can complete a test smoothly, so the other part of blade also can use 3D to print a technology to make. The subsidiary LM Power of GE also prepares at any time this brand-new the technology is pushed to the market.