Company of A division power issued announcement on March 25, 10 thousand tons of step that express to begin to undertake stop production is overhauled from Feburary 27, 2024 get together ether amine product line has finished the overhaul. Through the maintenance of a month, this product line restores production smoothly already to move now.
The normal production that overhauls company of power of the division that it is A this safeguards an activity, the company suspended getting together during the overhaul the production of ether amine. Up to now, overhaul job ends satisfactorily already, product line has thrown production afresh.
It is reported, without Xiakeli Inc. of science and technology held water 1999, predecessor is limited company of chemical industry of power of division of the A that do not have stannum, be located in stannum of the city that do not have stannum a mountainous area east garden of industry of harbor town new material, register capital eighty-seven million nine hundred and thirty-seven thousand five hundred yuan, cover an area of a face to accumulate 70 thousand square metre. On October 25, 2017, the company hangs out his shingle successfully in Shanghai stock exchange appear on the market, stock code 603722.