By Feburary, report casts a group to be released formally " social responsibility reported 2020 " . Since holding water in July 2015, report is cast issue this report 6 years continuously, the determination of the cause of ” of company of top-ranking and clean energy that showed an enterprise adequately to realize “ construction to have competition ability and confidence. " report " show, report joins a group capital total amounted to 1.32 trillion yuan 2020, business income amounts to 276.7 billion yuan, profit total is 20.7 billion yuan, net profit is 13.8 billion yuan. Up to by 2020, report delivers aircraft of electric power general assembly 176 million kilowatt, grew 25.34 million kilowatt 2019 compared to the same period. Among them machine of outfit of clean the sources of energy 98.88 million kilowatt, occupy than 56.09% , increased 5 percent 2019 compared to the same period. The machine of outfit of new energy resources such as wind report, smooth hot season amounts to 60.49 million kilowatt, house. Specific and character, machine of coal report outfit 77.4 million kilowatt, take chance of outfit of group energy resources 43.9% ; Machine of wind report outfit 30.88 million kilowatt, take chance of outfit of group energy resources 17.5% ; Machine of outfit of smooth hot season 29.61 million kilowatt, take chance of outfit of group energy resources 16.8% ; Machine of outfit of water and electricity 24.01 million kilowatt, take chance of outfit of group energy resources 13.62% ; Machine of nuclear report outfit 6.98 million kilowatt, take chance of outfit of group energy resources 3.96% ; Other (burn machine, raw material) outfit machine 7.41 million kilowatt, take chance of outfit of group energy resources 4.2% . Wind report installs machine dimensions to be next to coal report, become report to cast dimensions of machine of group division remove theatrical makeup and costume big but second birth the sources of energy. Report delivers aircraft of wind report general assembly 30.88 million kilowatt, rank 2. Assets basically is distributed to wait for 23 provinces area in Qinghai, Tibet, Gansu Province, Inner Mongolia, Jiangsu, pressing cloth of examine of Inner Mongolia black orchid quickly, base of phone of maritime wind of Jiangsu, Guangdong is built. 2020, report is cast increase chance of wind report outfit newly 11.55 million kilowatt, summation of before dimensions of wind electricity put into production exceeded 4 years of put into production. Overseas business side, up to by 2020, the business outside the condition covers 46 with the area, among them “ is taken all the way ” along the line 37, installed capacity generates electricity outside the condition 6.058 million kilowatt, clean the sources of energy is occupied than amounting to 70% , the condition is explicit build machine of electric power outfit 1.625 million kilowatt.

2024
Newsolar Conference
15-18 December

New York City