Gas gel regards a kind of tall dispersive solid state as material of three-dimensional accept rice, it is the solid stuff with foregone at present low thermal conductance, in heat, optical, electricity, mechanical, acoustics wait for a domain to show a lot of distinctive performance, be known as the magical material ” that “ changes, industrial heat insulation, building is reached in the hi-tech domain such as aerospace energy-saving wait for civil domain to have very wide application. Chemistry China Liu Xincai expects in limited company 300 thousand / year first phase of project of composite material of gel of silicon radical gas 50 thousand / year project general at the put into production end Feburary. President Tian Jian introduces Liu Xincai, hua Liuxin material 300 thousand / year project of composite material of gel of silicon radical gas is located in area of Chongqing long life, cover an area of about 938 mus, always invest 5 billion yuan, cent period construction is carried out. Among them, first phase invests 900 million yuan, build production area of workshop, storehouse, canister and form a complete set are fair complementary project, body year after year produces 50 thousand / year the productivity of composite material of gel of silicon radical gas; 2 period main product adds 100 thousand newly / year composite material of gel of silicon radical gas, ester of silicon acid of form a complete set wait for silicon radical new material; 3 period main product adds 150 thousand newly / year composite material of gel of silicon radical gas, form a complete set is other and new-style makings of silicon base material. Project of “ first phase begins trial production by Feburary, the project will be amounted to this year in June postpartum, banner, top-ranking market research and development, production, sale will be made here multivariate the gas gel of unifinication is new data industry base, thrust moves Chongqing to build the new material raise that has force. ”“ is current, 2 period the design of the project and program had been started, strive for the end of the year to begin construction construction, next year building is cast with. ” Tian Jian says.